Daily Archives: April 28, 2016

Finished?

Standard

Well I suppose we can now say yes to the small bedroom project. We had been waiting for the carpet fitter to lay the carpet on Monday morning so that we could bring back the furniture into the room. The guy came on time as planned and less than an hour later it was finished. Whilst he was here I asked him if he would be interested in laying the artificial turf when it arrives and he said he would. I showed him the patio so that he could see the surface where the turf would be laid. We talked about the adhesive that would be needed and he told me he would source that at a cheaper price than we would otherwise have had to pay if we bought it ourselves. When the turf arrives I have arranged to call him so he can see it and then set a date to lay it. In the meantime E and I cleaned the new carpet and brought the furniture back into the room. Small bedroom 16

Small bedroom 17

Small bedroom 18

The bed needed re-assembling as did the wardrobe. We needed to carry out some minor repairs to the wardrobe and level it so it would stand erect, we also had to adjust the door catches as they had always been a problem in the past. The reason the bed is empty is that we are waiting for the delivery of a new mattress on Friday. E went out after lunch and I was at a bit of a loose end until I remembered a job that needed doing at the top of the house. If my readers will remember we had two roof leaks repaired recently and the ceiling in one of the top rooms had been damaged because of the ingress of rain. Six years ago we had roof repairs and a lot of other works going on around the house but the roof leak hadn’t been discovered though we thought it had. The ceiling was not repaired at that time as there was no time to do it. However it got left and almost forgotten about, shelved for another day which never arrived! It was fortunate in a way that repairs weren’t done as the recent leak would have necessitated it being done again. I had a tub of ready-mixed plaster in the house so I used it all to patch up the area. Naturally that was only to be the base and a top coat of plaster would be applied later. Both the ceiling and part of the adjoining wall had been damaged.Top room damage

Six years are a long time to leave before doing a job but in this case it saved doing the job twice!

Shirley Anne

Advertisements