Should I?

Standard

Should I or shouldn’t I? That theme was mulling around in my head for hours on Wednesday evening. It was all to do with my project on the Plot. I had pretty much used all the materials I had so more needed to be purchased. The weather forecast for Friday and throughout the weekend was for rain. That meant all outside construction work would cease. Of course if I had a large enough tent to cover the site the rain would not be a problem, however I do not posses one. Perhaps if I had thought about such things many years ago I might have purchased something and had one to hand. The only other option would be to buy an awning but it would need to be fairly large. The project doesn’t warrant the cost so when it rains the project stops. It isn’t as though it will rain non stop for weeks, mind you this is the UK I am talking about so anything is possible! Should I buy in the materials and perhaps do a couple of hours work on Thursday morning while it was still hot and sunny or should I wait a few days and buy the materials then? No contest with me, I had to be doing something. The only drawback when purchasing these heavy materials is that I have to empty out my van of electrical gear and tools if I am to collect them myself. The alternative is to pay the merchant to deliver, the cost of which could buy me more materials. If they deliver I have no control over the time or even the day of delivery. When I have nothing to do but work on my project I don’t want what time I have to be wasted waiting for materials to arrive. I emptied the van and whenever I do that I place everything on the garage floor in a neat and tidy order to make putting it all back later far easier. I have to be careful not to purchase too much as I don’t wish to overload the van, although I could make a couple of trips if I needed to. The merchant is about  mile and a quarter from home so a couple of trips don’t take up much time. All I wanted this time was six bags of sand and two bags of cement so only the one trip was necessary. Once I returned home and offloaded the materials and reloaded my electrical gear I was ready to do a couple of hours work. Plot 9

Plot 10

I didn’t want to work in the afternoon for two reasons, one, it was going to be a hot day and two, I wanted the mortar to have enough time to set before the onset of the rain we were promised the following morning. I only laid twenty-five bricks but it was enough to have satisfied my goal for the day. I finished at noon, plenty of time before the likelihood of rain, about fifteen hours or so. I tidied up the area and stored everything away until next week. I could concentrate on electrical work until then and I had plenty of that to do. The old metal bin you see in the first picture we have been using to burn rubbish inside. When I lifted it out of the spot where I had put it temporarily the base fell out! I am wondering how much longer it would last if I didn’t get rid of it? It is old and worn out…..a bit like me!

Shirley Anne

Advertisements

Comments are closed.