Waiting for the rain

Standard

Up early again on Wednesday to do more work on the Plot. Wednesday was an ideal day for working outdoors being as it was slightly cooler than of late. After an early breakfast I was outside at a little after eight o’clock and was soon working. I didn’t have to set up the mixer so I was pretty much able to get straight to work. My main object for the day was to finish building the walled enclosure, its inner walls. I managed to do that but I may take the structure up one more level of bricks as I have discovered I have sixty-three bricks remaining and to lay another course will take forty-eight bricks. As it stands (Wednesday) there are seven courses of bricks. Of course I will be topping the walls with natural stone in keeping with the patio brickwork. In this picture the work has been temporarily covered because rain was forecast for Thursday and I wanted the walls to remain dry.Plot 12    Now then, I had finished with mixing mortar for the day as it was approaching lunchtime and I wasn’t prepared to carry on working into the afternoon. Rather than do nothing I chose to remove part of the wall alongside the path and dig out the soil behind it as you can see in the bottom right of the picture. I then laid some old bricks and rubble as a base for some concrete upon which I will lay a paving slab later. Eventually there will be three steps to match those I constructed a couple of years ago shown on the left in the picture. The plastic sheet standing there covers what is left of the four hundred bricks I had delivered for the work. There are sixty-three of them as I mentioned. Before I can fill the structure with soil I have to ‘point’ the internal walls, that is fill in all the gaps in the joints. Later I will have to do the same with the outer surfaces of the construction. I had my lunch and then spent a few minutes on the patio but was disturbed by a phone call from the auto-electrician who had been repairing the fault of my van’s lighting switches. I walked to their workshop about a mile away and collected the van. The guy had to replace the whole mechanism which slides over the steering column and to which the control stalks are fitted. The cost for the replacement and fitting it? £246! I knew it wouldn’t be cheap but I didn’t expect it to be quite as expensive. I’m going to need a couple more electrical jobs to offset the outlay. Fortunately the work is still coming in.

Shirley Anne

Advertisements

Comments are closed.