Problems

Standard

Again on Wednesday I was busy during the morning and up until one-thirty working on the Plot taking advantage of the warm, even hot weather. The only drawback was the humidity which was rather high and it made working in overalls pretty uncomfortable. Now and then a breeze would blow but it made little difference. The plan for the day was to lay the top of the three steps having laid the hard-core and concrete on Tuesday and also to decide what I would be doing about the surrounding walls. Before I did anything else I sorted out what old bricks I had with which to work. The twelve new bricks left over from building the flowerbed wouldn’t be suitable as they didn’t match the bricks in the old walls. Part of the old buried wall would have to be demolished anyway and the bricks removed would just about give me enough with what I had already to rebuild the walls. I mixed enough mortar with which to lay the final step and spread it out over the prepared concrete. I then had to manoeuvre the paving slab up onto the second step and on to the two bricks I had placed there to make it easier to ease the slab down into position, Did I say ease? You can only lower such a weight so far before gravity takes hold and it slops down onto the wet mortar. Not having anyone to assist me I have to devise alternative ways to move heavy objects around. Once the slab was on the mortar it was exceedingly easy to slide it about and tamp it down until it was in the desired position. It was then that I noticed that the rear edge of the slab was not exactly parallel with the end wall of the flowerbed but I knew that would be the case. The reason being the wall at the pathway had not been built parallel to the main garden wall which separates us from our neighbours property. So although by build was parallel to the wall it could never be parallel to the wall at the pathway. The only solution would be to rebuild that small wall but it simply doesn’t justify doing it. I plan to fill in the space at the rear of the top step with a fine concrete anyway so the discrepancy, small as it is, won’t be noticeable. That was the first problem. I will insert the picture here so you can see.plot-24     The right-hand-side small wall alongside the lower two steps gave me the most challenging problem because the pathway wall at right angles to it is the one which isn’t parallel to everything else and consequently the right angle abutment wasn’t parallel with the steps. I had to knock most of it down and rebuild it but in doing so I had to make the front edge slightly wider in order to get it aligned with the steps. I call it an unavoidable manipulation of an original cock-up. I mention here again that I didn’t build the original wall. The opposite small wall on the left of the steps presented me with a different problem as I had to demolish part of the double-brick buried structure to make use of the extra bricks but someone had topped that wall with a very strong concrete and it looked as though they had used concrete instead of mortar in places. I managed to do both walls as you can see. The next problems are rearing their heads as I move along with the project. One is how to align the paving slabs in a reasonable way to make it presentable but I can see I will need to fill in a lot of spaces with fine concrete to make that possible. The other smaller problem is being able to fill in behind that pathway wall on the right which adjoins the patio wall. I have decided to use mainly concrete to do it. My next task will be to level the ground in preparation for laying the other paving slabs. I have nine left but I think I may have to purchase a few more.

Shirley Anne

Advertisements

Comments are closed.