Just too tired

Standard

I had been very busy almost every day during the week but come Thursday I felt so tired and weary and struggled to do anything. However I did work but at a more leisurely pace. I started a little later too but only a half-hour or so. The filling in between the paving slabs, the ones I had laid so far, had been done the day before but there remained a small area next to the new steps that I had left because I wanted to plan what I was going to do there. I had decided to add another course of bricks to those already there first so that I could maintain the thickness of the screed to match the paving slabs. It meant that on the paving slab side half of the height of the bricks would be covered leaving a few centimetres showing to enable me to fit some natural stone capping on top. On the other side of the steps I needed to build up the groundwork to enable a couple of extra bricks to be laid there for the same reason. First though I had to see if I could dig out some usable bricks, sixteen to be precise, from the heap of second-hand bricks we have lying about by the small greenhouse. Most of them were still covered with mortar or cement so I had to chisel that off. After some time I managed to get the sixteen bricks I needed. I broke up a few more and used them as rubble where I had to lay some concrete to allow the extra bricks on the right-hand side of the steps to be laid later. I chose to mix all the concrete I needed in the wheelbarrow because that much would be enough. I didn’t want to use the mixer and then have to clean it out just for the one mix. So I fixed some shuttering where it was needed and then laid the concrete, covering it up to protect it from the rain which was forecast overnight. I would be able to lay all the bricks and perhaps finish the laying of concrete that had been left undone. The following day, Friday, I had the time to continues with the work. Friday was a much welcomed cooler day. It had been raining in the early hours of the day but at nine o’clock when I started the work it was fine and sunny. I wanted to lay the extra course of bricks on both sides of the steps and then finish laying the concrete on the left of the steps. I managed to do that but just as I was smoothing out the concrete it began to rain. It was a light shower but it got heavier after a few minutes so I had to scramble and look for something to cover the area while I finished the work. I got drenched in the process but I was able to finish the work as best I could. Considering the situation I think I did well. Later and after lunch I returned outside and re-arranged the covering that I had hastened to set up as it was and as you see in this picture. I would leave it that way until Saturday morning just in case it rained again. So now the two walls alongside the steps are one brick higher and apart from a couple of small finishing off cementing jobs on the left of the flowerbed that side is complete.plot-30 The next phase will be to level the ground on the right-hand side of the flowerbed and lay the four paving slabs which remain. It was around noon on Thursday by the time I had finished what I had to do on that day and to be honest I was glad I could rest for a while from the work at least. Before lunch I drove off to the place where I had purchased the natural stone slabs for capping the flowerbed. Some of my readers may remember that I had purchased three more than I had needed for that job although it was the guy at the depot who had made the wrong calculation but I intended to use them elsewhere and kept them. I will be using them to cap the bricks around the new steps and also on top of the small wall behind which I recently poured concrete to strengthen it. However I needed one extra slab at 600 mm in length and three others at 300 mm in length. I would then have four long slabs and three half the length to do the work. I bought an extra bag of cement at the same time to save another visit to the builders merchant. I needed fuel for the van so I made the detour to the filling station before driving home but on the way to the filling station I received a call for my electrical services from an old couple living in the next town. I got the fuel then dropped the materials off home before driving to the job. I was there less than an hour but it covered the cost of the fuel and the building materials I had just purchased with a little over too.

Shirley Anne

Advertisements

Comments are closed.