A lull

Standard

I had been reasonably busy on Monday, especially in the morning as I had been removing many light fittings and replacing them with basic roses and pendants. The lady of the house had sold the property and wished to take the lights with her to her new property in Hampshire. It is a requirement that electrical circuits in a property must be in working order with all fixtures and fittings in place or as in this case replacements fitted. I don’t know why some electricians insist on wiring some circuits the way they do when it leaves too many cables at the light ceiling roses. rose-connectionsThe maximum should never really be more than four cables, that is twelve conductors. The minimum of course would be one or two cables, that is three or six conductors. Ceiling roses can accommodate these levels though I have to say the more conductors the more difficult it is to connect them neatly. Another thing I find with some electricians is the lack of slack they leave in the roses or switches which makes alterations and repairs almost impossible in some cases. These are the problems I had  at this house so it inevitably took me longer than normal to do the work. Anyway, Tuesday started quite differently as I had no scheduled work but there was one job I wanted to do at home which was to fill-in the three small spots on the Plot with concrete where they couldn’t be done when the original work was carried out a couple of weeks ago. It was less than an hour’s work and I was soon back indoors with nothing to do. I was waiting for a call from the place I had ordered the wall plaque a few days earlier and also from an electrical wholesaler  who was sourcing the part-night photo cell I have been attempting to acquire to control the garden lamp-post. It was mid-morning when my phone rang but it was an invitation to work at a house less than a half-mile away. I was more than happy to oblige as I was beginning to get bored. He had a couple of track lights, the track of which appeared faulty but after testing I discovered it was the lights themselves that were faulty and would need replacing if he wished to keep the track system. track-lightingHe wouldn’t need me or any other electrician to fit the replacements. I returned home with the prospect of little to do for a couple of days.  There seems to be therefore a bit of a lull in activity and until I receive the plaque and the sensor I will be searching for things to occupy my time. I had one job scheduled for Thursday but it was rescheduled to be done on Friday instead which meant Wednesday and Thursday would be free though I did have a dental appointment on Wednesday morning. I really looked forward to that!

Shirley Anne

Advertisements

Comments are closed.