Goal achieved

Standard

I can relax a little now that all the major projects I had set myself to do this year have been accomplished. I will not remain idle though for even now I can think of things I can do to keep me occupied. On Wednesday morning after breakfast I undertook to finish the small project I had started the previous day which involved alterations to floodlights at the rear and one side of the house. Basically all I had left myself to do was to fix a new floodlight and a connection box then terminate the wiring after which I painted the remaining section of the main cable I had been unable to do the day before. rear-floodlights-4-and-5

The light which used to be where the black connection box is just around the corner (top-middle) has now been re-positioned where you see it on the right of the kitchen window. A cable now runs from the connection box to a new position beneath the other kitchen window here in this picture …side-wall-floodlightIt now shines directly upon the Plot when activated and will better illuminate the area and especially the passageway beneath it. The faulty floodlight will be partly dismantled and tested and if it is only the sensor that is faulty and not the LED lamp I will keep hold of it and use it elsewhere. It didn’t take long to dismantle the tower and store it away until it is needed again. It was almost lunchtime but I waited an hour before indulging. After lunch I had set myself a little plumbing job to do. If any of my readers will remember, I drained down the central heating system radiators and pipework a couple of months ago while it was still Summer in order to fit new radiator valves where I could get at them, though not all of them needed replacing. That meant air in the system when I refilled it of course, most of which I vented off manually. However, the bathroom towel rail heater remained air locked even though I had made alterations to the pipes in the airing cupboard to enable me to release any trapped air. I needed to get to grips with the situation but what with all the other work I had been doing I never really had the time. I attached a previously made length of hose pipe with a connecting pipe and fitting to the valve I had installed when the system was empty of water and allowed the water to gush out and into the bathtub. Surprisingly there was no air but just a little sludge, enough to stem the flow of water when in use. Thankfully the towel rail heated up and I was able to pack everything away.

Shirley Anne

Advertisements

2 responses