More relaxed

Standard
English: Relaxed rabbit

Relaxed rabbit (Photo credit: Wikipedia)

This post is really an extension to the previous one in a way. Over the last three months I have done extensive work in the garden in removing bluebells by digging them out one by one, sometimes a few at a time and it has been hard work. There are no other ways to remove bluebells other than by digging them out for they are very resistant to herbicides and cannot be removed that way. I have nothing against the plant itself, they are nice flowers but the problem with them is they spread themselves all over the garden which earns them the same status as weeds. As we don’t want that sort of takeover bid in our gardens I’ve had to spend a lot of time removing them. In the week preceding my writing this post I have succumbed to the effects of that work, muscular pain in my upper legs and buttocks due to them being stretched whilst I have been in a kneeling position. It got so bad I could hardly walk at times and it was uncomfortable whenever I sat down. I was reluctant to stop the work because I was keen to get rid of the bulbs but the weather turned wet and windy which stopped me anyway. That was a good thing for I began to realise that it just wasn’t worth injuring myself because of some unruly plants especially as they would still be there to dig out another day. I decided therefore to slow down the process and be less uptight about getting the work finished. My problem is that once I get the bit in my mouth I can’t wait to rush in and get the work done. So since the previous weekend things have slowed down considerably and at the time of writing this on Monday I have done only an hour’s work in the rear garden. I mentioned that in the previous post. Today, as I write this on Monday I have spent only a half hour digging out a few bluebells in the front garden flowerbeds. As much as I wanted to do more because the weather turned bright and sunny I resisted the temptation. In any event my muscles had not fully recovered and I didn’t want to prolong the healing process. My electrical work has been slow in coming in but I have some work in that area yet to do. I am finding it difficult to slow down and spread the work out but it is something I need to do else burn myself out! It is harder too because I am doing the work alone at the moment. I need to become a more relaxed bunny!

Shirley Anne

Advertisements

Comments are closed.