Never fails

Standard

On the face of it I would have little to do on Wednesday but I was eager to do something to support the progress in the small lounge. All the decorating was done so it was down to getting the other things out-of-the-way. One of those was to refit the radiator and I did that first. All seemed to be fine with that once I had bled out the air to prevent it circulating and finding its way to the upper rooms. I raised the room thermostat to test it under operating conditions for a while before throttling back on the thermostat. The day, even that early in the morning, was warm and the heating didn’t need to be on. I moved to the coffee table and placed it back on its legs after I had painted the underside the previous day and sanded down the top surface. I then painted it again and touched-up the paint on the radiator where I had missed when painting it the day before. It was then that I noticed some water on the floor at the base of one of the supply pipes, the lower connection was leaking! It never fails does it? I try my best but sometimes it isn’t good enough. The radiator was now full of water so slackening off the connection would result in more water escaping, much more. Why couldn’t it be the top connection which wouldn’t leak out much water once the valves were closed?  It had to be the lower connection didn’t it? Anyway the problem as I saw it was not the fitting (valve) itself but grit trapped between the surfaces preventing a water-tight seal. With that in mind I slackened off the connection, the one on the right of the valve body with no paint on it and actually part of the radiator and re-tightened it a few times to allow the water to flush out anything that might be there. It worked but I checked it out a few times during the morning just to be certain. I had nothing further left to do but wait for the delivery of the piece of furniture I had bought the day before. It wouldn’t arrive until the afternoon so a visit to the pub was out of the question. You will know now that soon after the cabinet was delivered yesterday I had it coated with the primer. It was a gloriously sunny and warm day on Wednesday, ideal to sit out on the patio, if I could be tempted!

Shirley Anne

Advertisements

Comments are closed.