Time slot

Standard

Following on from yesterday’s post it turned out that the weather was favourable on Saturday after all. I am referring to recovering the top of the garage wall with a concrete mix. When discussing the work with E’s nephew the builder he assured me that the seal between the fibreglass and the brick walls would not let in water. Well he would have been right in that assumption had the joint been against a smooth and flat surface but brickwork as you might guess is far from that, especially if the wall is aged and the mortar has given way in places! I checked inside the garage for any leaks the following day and sure enough there were four of them, though one was not associated with the new roof alteration work. They were all but one very minor and that which was worse wasn’t too bad, just bad enough to do something about it! Any leaks are undesirable, especially after new work has been done. Part of the problem was due to the top layer of bricks not keeping out the water because the mortar had cracked and some weeds had found a home in them. I had suggested all the bricks have new mortar or be repaired but nothing was taken on board. Any builder worth his salt would have ensured the wall he would be securing something to was solid enough to take it. Seems our builder didn’t think it was necessary. At the end of the day it didn’t matter because I could carry out the repairs to the brickwork myself. All I needed was a time slot in which to do it. The weather forecast hadn’t been promising and rain was said to be on its way to stay for a few days. There was just the one slight opportunity after lunch on Saturday when it would remain dry for about the next sixteen hours. It was raining when I arose and it didn’t stop until about ten-thirty. We knew that marked the beginning of the short dry spell so I took the opportunity and began the work. Here is the result…

The topping is a fine concrete mix, that is sand, grit and cement rather than just sand and cement in order to give it durability and strength. The same mix is used when laying a footpath and at the rear of our house there is a footpath constructed using the same mix. It has been there for 28 years and is as good as the day it was laid. Not only have I put a layer on the top (where it was needed) I have put some on the sides too as that was where water was getting in mostly. That should have been done by the builder before the new roof seal was applied so that the fibreglass could be placed over it. That can still be done should there be any more problems but I have a feeling it won’t be necessary. The rain held off until well after the concrete had set. Timed to perfection. The work had taken about thirty minutes to do.

Shirley Anne

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s