Plenty to do

Progress on the cellar storage room is making headway but it is time-consuming. The main problem the room has is its location which is beneath the porch at the front door of the house. The rear wall backs onto the ground beneath the threshold and is prone to moisture ingress though it isn’t as bad as it could be. The only saving grace is the fact that the area outside the front door is covered with stone so the ground doesn’t get really wet.Now that the room is empty while work is ongoing the walls can be treated with silicon sealant which hopefully should solve any damp issues. Not all of the wall seems to be affected fortunately, just a few bricks. On Friday (6) after working in the room on and off for most of the day I gave the wall its first coat of sealant. I had started work in the morning concentrating on filling in some holes with bricks and later fixing timbers across the ceiling near the room entrance in order to strengthen it as it was necessary. 

The holes in the following two pictures have yet to be filled and the wiring tidied up. They won’t be as easy as you might think for there is a void behind them being as they are between the ceiling joists. I was faced with similar problems when refurbishing the gym/boiler ceiling.

The next picture shows the storage cabinet that stood against the rear wall of the storage room. It is staying in its new position at the end of the workbench in the room we call the workshop as shown. This room could do with a face-lift too. At the very least it needs tidying up!

 So there is plenty for me to do if I get bored but for now there is plenty to do on the storage room project.

Shirley Anne