Two on the go

It was Thursday 13 th and I had been out doing the weekly shopping and as I go there quite early to the supermarket it leaves the rest of the day free to do other things. On my return however I was feeling a little hungry so made a sandwich. I wanted to get on with the work in the cellar but didn’t start until ten o’clock. The small storeroom was on hold because part of the floor was still damp and accordingly couldn’t be painted. I mentioned it might take days for it to dry out and I didn’t mind that as long as it did dry out! So I concentrated on the second project which was the refurbishment of the hallway and specifically the boxing-in of the section of pipework I wanted to get done. I spent a couple of hours doing that and after lunch continued with it. Before that work started however I replaced the light unit with a long LED unit exactly the same type as others I had installed in other rooms in the house.

As you can see it hadn’t been clipped into its fixing brackets because prior to installing it I filled in some holes with plaster. When the plaster was dry I would paint the ceiling where the light would be before clipping it into its brackets. I also fitted the inspection cover over the access hole on the ceiling in the small storeroom beneath the wet room drain. That repair to the leak had been successful. I didn’t finish the boxing in on the day but got much done as you can see in the pictures.

The other work to be done in the hallway would consist of filling in holes in the ceiling and walls before removing the carpet and items stored there. Following that it would be painting the walls, repairing the floor as necessary and then painting that too. That would keep me out of mischief for a while! 

Shirley Anne

Advertisements