Two days left

I write on Dec 29 in the afternoon just having eaten lunch. I had been working in the cellar hallway for a couple of hours earlier and it was all woodwork. There was only two working days left before the end of the year and I had it in mind to give everything a second and final coat of paint but there were still some minor issues to sort out first. Not a great deal of attention had been given to the doors and door frames down there when they were installed as most of them showed gaps or had been installed incorrectly. A couple of the doors were slightly warped, namely the one for the larder and the one for the utility room. I have taken steps toward reducing the warp on each. I have fitted thresholds beneath those doors which previously had none and fitted extra timbers either to the tops of the doors or the frames to eliminate the gaps. Those timbers have yet to be painted as I write. So this morning I concentrated on completing all those fiddly extras. It was around one o’clock when I stopped work for lunch but didn’t actually get to eat anything for a hour. E and I watched a movie during lunch and once it was over I didn’t much want to return to work so left the painting until Monday. Even when that was done there would still remain the floor. That requires the same cement treatment the other rooms had before it can be painted over therefore it will be early January before I can sort it out. The final stage of the hallway refurbishment involves doing the stairway and in fact the stairwell will probably get a coat of paint and repairs to the stone steps before the main floor is started upon.

Although it looks newly painted it isn’t. The second step up from the bottom needs a cement job on the right-hand-side behind the black post. There is some minor work to be done at the top of the steps too. Incidentally the window at the top of the steps is the double-glazed unit we made when we built the wet room a few years ago which is obviously behind the wall.

Shirley Anne

Advertisements