What’s going on?

Here in the UK we have been and are still being bombarded with advertisements concerning PPI (Payment Protection Insurance). Years ago people were offered the opportunity to protect their repayments on a loan should they become unemployed or lose part or all their income. However it was discovered in more recent years that the system was found to be illegal and consequently all contributions to such a scheme could be reclaimed. Of course there would be the need for legal representation to effect such reclaims and many solicitors (lawyers) companies offered such support and still do so through mainly television advertisements. One such company opens their current advertisement with a guy saying ‘What’s going on, I mean about your PPI? I could smack his face he is so annoying. In fact the whole PPI business advertisements bore me soft. I have never taken out PPI. Though I may have borrowed money in purchasing certain high-priced goods I have always had the cash in the bank to pay off the entire debt should it have been necessary. My attitude has always been if I cannot afford something I don’t buy it. That aside, I have digressed from the initial subject of this post but I used the point to show how annoyed I get with unsolicited and unnecessary attempts to put me under pressure when they don’t concern me. That applies to all forms of solicitation as far as I am concerned. If I didn’t ask for it then it should be obvious that I don’t want it! When I do ask for something however I expect it to happen and barring all minor mishaps along the way (for no-one is perfect) my requests should be delivered as requested. If that cannot happen when the right person is asked and takes on board my requests then what hope do I have? A few weeks ago now I asked E’s nephew, a builder, if he could elevate part of the garage roof in order that I could have a new roller-shutter door installed beneath it. The work was carried out quickly and it was sealed over with a fibreglass based compound rather than bitumen covered felt as the rest of the roof. He insisted and assured me that the new substance was superior and indeed it seemed to be, that is until I spotted a leak. I had asked him to carry over the covering to include the adjacent bricks but he failed to do so saying it wasn’t necessary. He was wrong. He returned and gave the surface an extra coat of what I thought was the same compound but it dried a different colour. He hadn’t placed some fibreglass sheet over the joint before painting it over with the compound as I think he should have but again it appeared fine and there were no leaks. I had the new door fitted on Friday (6th) and on Saturday E and I went into the garage to check out the door operation just prior to the fitters returning to add the alarm (see yesterday’s post). I noticed the roof was leaking where it had been elevated! I climbed the ladder to investigate and discovered the whole of the fibreglass covering was raised as if air had been trapped beneath it and indeed that was exactly right. It hadn’t adhered to the ceiling timbers and it appeared the gap between the bricks and the roof where it should have been covered was letting in some water. Two problems, why didn’t it adhere and why didn’t he do as I had requested? Needless to say the covering will have to be redone……at his expense. I mean, What’s going on?

Shirley Anne

Advertisements

Extra work

After E’s nephew and his crew had finished their work on the garage roof alterations I finally got the opportunity to finish the electrical work on Friday morning. The task was to wire-in the new power outlet from the existing circuit in the garage but before I could do that I had to remove some now unnecessary lighting cabling and tidy up what remained. In the picture below all that work took place at ceiling height on the left above the ladders and scaffolding stored there and toward the door out of sight on the left. It would have taken far too long to shift everything to gain better access but the ladders and scaffolding were actually a benefit as I could climb them to reach the ceiling!

Once that was done I set about fitting a little extra support beneath one of the timbers. In the next picture it is the piece on the left flat against the wall at ceiling height. Let me explain. When the garage was built not all of the joists had been inserted into the house wall (the wall in the picture). Some had been supported by another joist which had been secured between two that went into the wall. It sounds complicated but in essence some of the joists could not be inserted in the wall where there is chimney stacks, and there are two of those along the length of the house wall.  

In the picture above two of the three joists had been inserted into the wall whilst the middle was supported by the timber lying flat on the wall. The left-hand joist of the two which were inserted into the wall had to be cut and removed.  It ran alongside the steel beam you can see top left. Now that short piece of timber on the wall was only secured to the outer timbers. Although the nails are intact and still in place the timber had been moved and it left a gap as you can see. My task was to fit a short length of timber to the wall beneath it thus giving more support (not shown in the picture).  It probably would be fine without it but I never take chances when it comes to structural integrity. At the opposite end of the now removed joist the crew had kindly left the hole unfilled. In the picture below it is immediately adjacent to the steel beam (top right).

It was awkward to get at and it needed much filling. I used a fine concrete mix and a brick. When bricklayers build double-thickness garden walls, which in fact the wall in the picture above is, they never bother to fill the gaps fully between the two bricks. Saving mortar I guess. The wall we reckon is as old as the house (1877). Later in the day I went to the top of the house to see E who was busy in her workshop  and I looked again at the roof…

…and noticed something that needs attention. In the picture above on the far side of the roof the top of the wall can be seen and it was capped with a layer of mortar when the garage roof had been constructed. Some of that mortar needs to be replaced, about one-third of it toward the front at the right-hand-side. When the weather permits I will do that work myself but I won’t be using just mortar, I will use a fine concrete mix instead, it is much stronger and less prone to cracking in the heat of the sun.

Shirley Anne

The Party’s over

As I write this on a dull Sunday afternoon the party is over and I for one could not be happier. What party you may well ask? The Open golf championship event here at Royal Birkdale. Don’t misunderstand me here, many people love the game of golf but I am just not one of them.

The picture above was taken through the window in a lounge at home at around five o’clock on the last day of the golf event. Up until then the day had been mostly sunny. On Saturday there had been much rain but the previous days had been fine and sunny. I am not sure how that affected the play though I have a feeling it made little difference. For the last few days the whole town of Southport but especially Birkdale had been geared up for the event with many local restrictions having been imposed upon us all. It is something we all have had to put up with whether we like the sport or not. I can live with that. I steered well clear of the course which is very close to where I live and spent my time away from the house in the opposite direction! However during the time I was at home we had to put up with a light aircraft circling above every two to three minutes for hours on end which really was annoying. When I say circling it was doing just that, flying in a circle around the course and our house was under the flight path. On Sunday morning I went for a walk and on my return I emptied out most of the things in my van. E and I were to go and collect some bricks from her nephew which were stored at a place less than a mile from home. He had graciously allowed us to take what we wanted which was around fifty bricks. They had been dumped with other rubbish and needed to be separated but it didn’t take long to do that and we were soon back home for lunch. I stored them behind one of the garages and under cover to keep them dry until I wanted to use them.

Later E received a text message from her nephew who was asking where we were and why we hadn’t called to collect the bricks! E had thought he meant for us to collect the ones we had but it appeared he meant those stored at his own house a few hundred metres away. Those bricks had already been sorted and separated whereas the ones we took we had to glean from a general pile of other material. Although the ones we took were not stored at his house they still belonged to him. The reason he has so many bricks is that he is a builder. He asked if we wanted more as he was  trying to rid himself of some of them. We accepted his offer and he said he would drop them off later. Now I won’t have to worry about buying bricks for the projects I have in mind to do. The first one is to put a gate at the end of this passage where it meets the main part of the garden.

That is at the end of the side wall of the house on the right. Now I am not planning to begin that work during the summer though anything is possible with me.

Shirley Anne

Apathy

Apathy. The day started well enough considering it was Monday, back to work day and the fact that I’d a restless night’s sleep. I had one electrical job to do at nine o’clock but I left the house much earlier in order to pay a visit to the builder’s merchant. I needed more materials. In my last post I mentioned I might have most of it delivered whilst carrying some of it home in the van but as I was going to work the van was full of my electrical gear so I arranged for all of it to be delivered the next morning, Tuesday. I did have some materials left over at home. When I arrived at the house where I was to work and assessed the customers requirements I decided against doing it explaining to them that it was too much work for me to do because of my age. I had gotten the impression over the phone that the work was much simpler but like so often people get you to their homes and then begin to expand and add work to the original request. Much of the work involved lifting floorboards and chiselling out walls and the house was carpeted and furnished. I knew I wouldn’t get much help from the customer in moving stuff around which made the prospect even more daunting. I seldom carry out installation work these days unless I know it will be easy. I was feeling a little tired too and weary of it all. Apathy had set in. I needed a break or at least a good night’s sleep but the day was young and I couldn’t simply sit around doing nothing. I telephoned a younger female electrician friend and offered her the work and she arranged a visit that morning. I drove home and put the van away. I wanted to strengthen the small wall of the Plot at the pathway as part of the general work I have been doing there so I decided that was to be my work for the morning.plot-27

plot-28

However, I couldn’t complete it as I didn’t have enough materials. Nevertheless I made a start by digging out the rear of the wall and putting some shuttering in before mixing the concrete and pouring it in the space. I used some scrap plasterboard as a sacrificial shutter for I wouldn’t be removing it later, it would be pointless. Had it been timber then I would have removed it once the concrete had set. I started at the point nearest the patio where the last Laurel bush stands for I knew there would be roots to contend with and sure enough there were. Part of the wall nearest the new steps has already been partially concreted , done when I was working around the steps earlier. Had this wall been left as a single brick structure it may have been subject to being slowly pushed down because of the Laurel. I will take the concrete to the height of the existing bricks and top the wall with natural stone later. At the time of writing there remains more concrete work to do behind this wall but it will be easier to do away from the main roots of the Laurel. After lunch I was beginning to feel better so I got my drill and screwdriver out and installed the steel-wire-armoured cable for the lamp post, when it arrives! I called the supplier regarding the delivery date but they were unable to tell me at that time. Anyway here are two pictures of the cable which runs from the patio to the corner of the garden where the lamp post will stand.lamp-post-cabling-1

lamp-post-cabling-2

The cable runs down the wall behind the washing line pole to a spot on the other side of the patio wall in the foreground. The electrical connection box and sensor will be fitted there as it is the north (almost) side of the wall. The cable is hardly noticeable even close-up as you can see because it is under the lip of the capping stones.

Shirley Anne

Calculations

I must have used tons or even tonnes if you prefer metric measurements of sand, gravel and cement over the years. I have often thought about keeping a record of purchases, not as a whole but for each job I undertake. Somehow I never seem to get around to doing it. It would be interesting to calculate the cost for each job simply as an exercise. I don’t count the cost but allow an approximate amount of funds to carry a job out, in other words I make a rough estimate.

Cement mixers
Cement mixers (Photo credit: Wikipedia)

I would never tackle a project if I didn’t think I had the funds to carry it out. On my latest project, that is the building work in the Plot, I have purchased as much materials as I think necessary for each stage only but I either end up with a little over or a deficit. For instance I might end up with a surplus bag of cement but with a shortage of sand. I never seem to get it that accurate. With my electrical work though I am very accurate but I suppose that is because I have done far more of it. It’s all a matter of experience isn’t it? If I am baking I seem always to need to refer to the recipe for things like quantities, temperatures and length of cooking time. Again it is due to the fact that I am not baking often. As I am writing this I am thinking about the quantities of materials I require to make the concrete I will need to fill in the spaces between the paving slabs out on the Plot and whether I should collect it myself or have it delivered. I may decide on the latter because I want an extra paving slab too and they are rather heavy. The other materials I could collect myself but would have to make a couple of journeys. I may decide to collect some and have the rest delivered instead. The problem with deliveries is that they never seem to happen when you want them and even then you need to be at home to receive them. As far as the project is concerned it is going well. As for the other project, the lamp-post installation, all I have done so far is to lay a bed of concrete but more may be needed. I won’t know that until they deliver the post which at the time of writing hasn’t yet arrived. It has been just over a week since I placed the order so hopefully it will arrive this week or will have done by the time you read this. There are a few more projects I would like to do yet if I have the time and if I have the inclination or if I live long enough!

Shirley Anne

Surprised myself

As Friday was to be a warm and sunny day and as I had no electrical work scheduled I had the opportunity to do more work on the Plot project. First though I had to pay a visit to the builder’s merchant to purchase more sand and cement. I didn’t have to empty out the van completely because I wasn’t intending to buy much, Even so I still had six bags to take home. Whilst there I purchased twelve large paving slabs too but they will deliver them for me on Tuesday. I may need more depending on what I decide to do on the Plot.  That done I set everything up apart from the cement mixer which I have been leaving outside overnight. I have to cover the motor and bearings though just in case it rains. It means I don’t have to waste time having to get it out of the garage and setting it up each day. The plan was to lay the final course of bricks to the raised bed I have been busy constructing, point the inner brickwork where necessary and then begin to fill the structure with soil a little later. After mixing a huge amount of mortar I discovered there wasn’t enough to lay the last two bricks! I knew I would need more anyway in order to fill in the gaps inside so I mixed more in a large bucket by hand. All I can say is I am glad we have a cement mixer for mixing large quantities! Once upon a time I used to mix everything by hand but it is extremely hard work if a lot has to be mixed by hand and I am no longer a young person. So I got this far at the end of the day……Plot 13

I didn’t begin putting the soil inside immediately but waited a while until the mortar had become firm. I guess I must have filled the bed to about half-way then I had lunch at some time around one-thirty. I was planning to resume filling it afterward but just before I sat down to eat I got a call from an old guy who had recently moved to the area and was having problems with some fluorescent lights in his garage. He lives just over a half-mile away so after lunch I went there and sorted it out. Easy money and it went part of the way to offset the cost of the materials I had just purchased. At the time of writing I may have to put off doing any further work for a few days. It all depends upon the weather.

Shirley Anne

Should I?

Should I or shouldn’t I? That theme was mulling around in my head for hours on Wednesday evening. It was all to do with my project on the Plot. I had pretty much used all the materials I had so more needed to be purchased. The weather forecast for Friday and throughout the weekend was for rain. That meant all outside construction work would cease. Of course if I had a large enough tent to cover the site the rain would not be a problem, however I do not posses one. Perhaps if I had thought about such things many years ago I might have purchased something and had one to hand. The only other option would be to buy an awning but it would need to be fairly large. The project doesn’t warrant the cost so when it rains the project stops. It isn’t as though it will rain non stop for weeks, mind you this is the UK I am talking about so anything is possible! Should I buy in the materials and perhaps do a couple of hours work on Thursday morning while it was still hot and sunny or should I wait a few days and buy the materials then? No contest with me, I had to be doing something. The only drawback when purchasing these heavy materials is that I have to empty out my van of electrical gear and tools if I am to collect them myself. The alternative is to pay the merchant to deliver, the cost of which could buy me more materials. If they deliver I have no control over the time or even the day of delivery. When I have nothing to do but work on my project I don’t want what time I have to be wasted waiting for materials to arrive. I emptied the van and whenever I do that I place everything on the garage floor in a neat and tidy order to make putting it all back later far easier. I have to be careful not to purchase too much as I don’t wish to overload the van, although I could make a couple of trips if I needed to. The merchant is about  mile and a quarter from home so a couple of trips don’t take up much time. All I wanted this time was six bags of sand and two bags of cement so only the one trip was necessary. Once I returned home and offloaded the materials and reloaded my electrical gear I was ready to do a couple of hours work. Plot 9

Plot 10

I didn’t want to work in the afternoon for two reasons, one, it was going to be a hot day and two, I wanted the mortar to have enough time to set before the onset of the rain we were promised the following morning. I only laid twenty-five bricks but it was enough to have satisfied my goal for the day. I finished at noon, plenty of time before the likelihood of rain, about fifteen hours or so. I tidied up the area and stored everything away until next week. I could concentrate on electrical work until then and I had plenty of that to do. The old metal bin you see in the first picture we have been using to burn rubbish inside. When I lifted it out of the spot where I had put it temporarily the base fell out! I am wondering how much longer it would last if I didn’t get rid of it? It is old and worn out…..a bit like me!

Shirley Anne

No more please!

English: View on tier 1 and 2 ISP interconnections
View on tier 1 and 2 ISP interconnections (Photo credit: Wikipedia)

My purse has taken quite a beating these past couple of months and needs a little time to recuperate. I have been spending as if my life depended upon it but the time has come for a rest from major spending sprees. On Wednesday morning E and I went out shopping initially for another tub of plaster in order for me to finish off that ceiling and wall repair I mentioned in yesterday’s post but I added that I wished to buy a pair of shoes too. E drove us to the shoe store down buy the sea front and I found the pair of shoes I wanted in minutes. They were flat-soled shoes for general walking about and will be used mostly when I am at work. However E decided she wanted a pair of shoes too and I ended up buying both pairs. Off we drove to the retail park a mile or so down the road and bought the plaster but while we were in the park I decided to visit the electrical store where we had recently purchased my new large-screen television. I wanted to see if I could buy another couple of televisions for the newly refurbished bedrooms at home. We looked at two different models each with a 32″ screen, one at a higher price than the other at which point a salesman showed us another with the same sized screen at an even lower price. I placed an order for two of them and paid the £258 asking price. The would be available for collection either Saturday (which will be today as you read this) or early next week. By now it was lunchtime so we drove to a nearby pub/restaurant and dined there. When we arrived home we spent some time burning stacks of paper printed upon which was information too sensitive to chance recycling it. Later I went on-line for a time using my old computer which runs Windows 7 but when I attempted to use the computer running Windows 10 I found it couldn’t connect to the Internet even though it was connected to the router! I contacted my Internet provider after many attempts trying to resolve the problem with no results but I got nowhere with them. At the time of writing this the issue was still not resolved but it had to be a software problem of some sort. A day in the life of yours truly!

And then there was an update: The problem was resolved later in the evening when  E discovered her computer wasn’t connected either! We reset the router and all was back to normal. Now I am almost certain that Windows 10 was more the problem as both E’s new computer and my new computer both run Windows 10. The other of my computers runs Windows 7 and had no problems with connecting to the Internet.

Shirley Anne