Back in there

I had been preparing the walls and floor in the area of the utility room ready for the installation of the new sink and cabinet unit early on Monday morning (yesterday’s post). I had painted them and had to wait for the paint to dry. The wall paint was dry soon afterward but the floor paint took longer and because of the fumes it gives off I couldn’t start the work of building the cabinet immediately. After four hours the fumes had dissipated and I went back to the room and assembled the cabinet, a flat-pack affair. I don’t know about you but I think flat-pack furniture can be somewhat daunting at times, it all depends upon adequate and easy to understand instructions. Diagrams and different screw sizes, parts that seem to be able to fit anywhere or nowhere at all and confusing instructions written by a foreign hand with little understanding of the English language all add up to a frustrating experience if not approached logically. Even the experienced DIY enthusiasts might find instructions problematical on occasion. As it happened the cabinet wasn’t difficult to assemble on this occasion though and extra pair of hands would have sped up the process!   

I had to drill a hole with a hole cutter in order to slide it over the waste pipe protruding from the wall. It is fortunate I have plenty of hole cutters. Nothing as yet is permanently fixed in place of course but it gives me an idea on how to proceed with the next stages. The sink/drainer has to be fitted in the plywood top and the plumbing connected amongst other things. I stopped work around lunchtime and would continue with the work during the rest of the week. Whilst I was waiting for the paint to dry I made another apple pie, later putting it in the freezer with the other pies I had made for the previous day I had made an apple crumble which hadn’t yet been eaten.

Shirley Anne

Advertisements